Opportunity Corridor, Section 3 (OC3) East 59th Pedestrian Bridge Improvements

CITY OF CLEVELAND, OHIO

Opportunity Corridor, Section 3 (OC3) East 59th Pedestrian Bridge Improvements

This bridge improvement project was a part of the major Opportunity Corridor 3 improvements in Cleveland. Ribway was responsible for structural and electrical engineering design and plan preparation for this new single span 98.0’ long x 16’ wide prestressed composite adjacent box beam bridge over State Route 10 (Cuyahoga IR 490) with semi-integral abutment walls supported on a single row of 24” cast-in-place reinforced concrete piles. Cast-in-place concrete pylons with recessed LED lights and room for community artwork were designed for installation at each corner of the bridge. Architectural metal fabric protective fencing and special RENO light column style lighting are located on the bridge. Construction of the bridge was completed in 2022.